Downtime was recorded on paper at the end of each shift, maintenance ran on fixed calendars, and managers saw efficiency numbers a month late.
- 01
Edge gateways reading PLC data over OPC UA
- 02
Cloud data pipeline with a common model for every line
- 03
Live OEE, downtime and scrap dashboards per shift
- 04
Vibration and temperature alerts for critical machines
- 05
Work orders synced with the ERP maintenance module
- 11%Higher OEE on the pilot lines
- 30%Less unplanned downtime
- LiveShift reports instead of month-end






